Proof rolling standards
Webthe appropriate ASTM standards (i.e.; E329, C1077, D3666, D3740, A880, E543) listed in the technical sections of the specifications. ... Observe fill and subgrades during proof-rolling to evaluate suitability of surface material to receive fill or base course. WebPerform proof rolling as directed. Adjust the load and tire inflation pressures within the range of the manufacturer’s charts or tabulations, as directed. Make at least 2 coverages with the proof roller. Offset each trip of the roller by at most 1 tire width. Operate rollers at a speed between 2 and 6 miles per hour, as directed.
Proof rolling standards
Did you know?
Webby the MGPEC Standards and the Douglas County Roadway Design and Construction Standards shall apply to roadway testing and inspection requirements. 8.1.3 ... accordance with 8.3.4 Final Proof Rolling. All costs associated with testing, retests, and associated reporting will be paid by the Owner/Developer. These test results shall be Webcourse, proof roll designated subgrade areas. If proof rolling is performed after the underdrains are installed, do not use the proof roller within 1 1/2 feet (450 mm) of the …
WebA proof roll is an assessment of the subgrade layer prior to installing overlying pavement layers. The subgrade proof roll is a visual assessment to determine if it will enable the … WebNew Specs. – Proof Rolling • Loaded triaxle dump truck (72,000 lbs. GVW) • Speed of 1.5 fps (1 mph) maximum • Cover entire area • No . permanent. deformation greater than 1/2” • …
WebProof rolling may be done either before or after pipe underdrains are installed. If done after underdrains are installed, rolling should not be done directly over the underdrains. In C&MS 204.06, proof rolling must be performed at least 1.5 feet (0.5 m) away from the … Webproof rolling of the subgrade prior to sub-base placement or lime modification. PROOF ROLLING Effective April 23, 2004 Revised January 1, 2007 This work shall consist of proof …
WebProof Rolling Once the embankment is completed and immediately prior to subbase placement (or Immediately prior to final trimming of the subgrade surface and placement of subbase materials in cut sections), the subgrade surface must be proof rolled. The proof roller is a large box supported by four (4) pneumatic tires one axle.
WebJul 30, 2024 · During a proofroll, the inspector should have marking paint with them to identify unstable sub-grade locations. Once unstable locations have been identified, the … titanium wallet cardWebPROOF ROLLING 216.1. Description. Proof-roll earthwork, base, or both to locate unstable areas. 216.2. Equipment. A. Specified Equipment. Furnish rollers that when loaded weigh … titanium wallet caseWebJul 4, 2008 · proofrolls are subjective and almost always variable due to the different soil conditions that can exist. proofrolls are also difficult to fully explain...especially when … titanium walletWebSep 20, 2007 · Primarily used for larger home site developments, proof rolling is a measure that allows contractors to identify whether or not the subgrade has been adequately compacted. Unstable or improperly compacted soil can be identified by driving a fully loaded dump truck or a similar piece of heavy equipment over the compacted area to reveal … titanium vs platinum wedding ringWeb2. All water and sewer lines will be tested before any proof roll is scheduled. 3. All utility crossings will be placed in the roadway ROW before any proof roll is scheduled. 4. The standard 50' ROW and an additional 10' behind road ROW (70' total) will be cleared and graded before any titanium wallet chainWebThe suitability of subbase for supporting concrete is checked by proof rolling. It involves driving across over the subbase right before the beginning of concreting. If the tires sink more than 12.7mm, then the subbase needs improvement and shall be recompacted. Supervisor shall look for rutting or pumping during proof rolling. titanium wallet cliptitanium wallets for men