Flowable fill specifications njdot
WebFLOWABLE FILL PART 1 - GENERAL 1.01 SCOPE OF WORK A. This Section specifies the requirements for flowable fill used for trenches, support for pipe structures, culverts, … WebMar 8, 2016 · Flowable fill is sometimes referred to as controlled density fill (CDF), controlled low strength material (CLSM), lean concrete slurry, and unshrinkable fill. 2) or less at 28 …
Flowable fill specifications njdot
Did you know?
Webwith flowable fill, and shall have their ends crimped or plugged, as approved by the Owner. C. Valves and Valve Boxes 1. At a minimum, the top two (2) feet of all existing valves boxes designated to be abandoned, including the frame and cover,shall be removed. The remaining portion of the structure shall be filled with the specified fill material. WebMetric Item 555.10----10: Flowable Fill US Cust. Item 203.03080017: Lightweight Concrete Fill (Type A) US Cust. Item 203.03090017: Lightweight Concrete Fill (Type B) US Cust. …
WebWhere flowable fill is shown for use on the Plans or described in the Specifications, it is intended that such fill be able to be removed at a later date if so desired with the use of ordinary trenching equipment or by hand excavation./ C. High Air Generators shall be used with flowable fill to reduce shrinkage WebCommon types of backfill material can range from native soils (which usually have fines, silt and clay) to imported crushed rock, to soil-cement slurry (or flowable fill/CLSM). Whenever backfill material other than native soils is specified …
Web6.1. Flowable fill will consist of a mixture of Portland cement, fly ash, fine aggregate, air entraining admixture, and water. Flowable fill is intended to contain a low cementitious … WebFlowable Fill (also known as Controlled Low Strength Material) is a flowable mixture which contains cement, sand, flyash, water and/or foam admixtures. Your local ready-mix …
WebThe 2007 NJDOT Standard Specifications book for Road and Bridge Construction is hereby issued. These specifications are written in active voice and are in U.S. customary English units only. ... • The Zone designations of 1, 2 and 3 along with Porous Fill, BEBF and Select material have been replaced with Soil Aggregate designations ( I7, I ...
WebSubsection 204.06 B.1 (pg. 151-153), 12-30-19; General Use Flowable Fill; Revise 1st paragraph & Revise Tables 204.06-2, 204.06-3, & 204.06-4: 1. General Use Flowable Fill. When not otherwise shown on the Plans, or specified in the Contract, provide general use flowable fill proportioned to meet the limits specified in Tables 204.06-1 and 204.06-2. fischer\u0027s at baslow hallWebmanufacturing and installation of the lightweight cellular fill. (b) Manufacturer's specifications, catalog cuts, and other product data needed to demonstrate compliance with specified requirements. These shall include reports and test results from ... within specification limits for strength or density. Action may include, but is not limited ... fischer\u0027s auto repair pomeroy waWebControlled low strength material, abbreviated CLSM, also known as flowable fill, is a type of weak, runny concrete mix used in construction for non-structural purposes such as backfill or road bases. Description [ edit] CLSM consists of a mixture of Portland cement, water, aggregate and sometimes fly ash. campion school romfordWebThe revisions to the Standard Specifications include the following: 1. The title of Section 204 has been changed to “Section 204 Flowable Fill” and the title of §733-01 has been changed to “§733-01 Flowable Fill”. 2. Use and installation requirements for Lightweight Concrete Fill have been added to Section 204 Flowable Fill. fischer\\u0027s at baslow hallWebA. Flowable fill refers to a cementitious slurry consisting of a mixture of fine aggregate or filler, water, and cementitious material(s), which is used as a fill or backfill in lieu of compacted earth. ... C618-03 Standard Specifications for Coal Fly Ash and Raw or Calcined Natural Pozzolan for use as Mineral Admixture in Concrete. (Use Fly ... fischer\\u0027s auto hayward wiWeb2006 Specifications and Standard Drawings ; 2012 Roadway Standard Drawings; ... SHOULDER AND FILL SLOPE MATERIAL (Lump Sum Grading) 2002-05: ... FLOWABLE FILL: 2012-01: SP04 R002 ... camp island lake winnipesaukeeWebJul 1, 2013 · a. Engineer may perform field density tests of compaction of each layer of fill following ASTM D1556, ASTM D2922, or ASTM D2937 2. Allow time for Engineer to perform tests after completion of each layer of fill in designated area. 3. Provide safe access and equipment to cut out smooth-surfaced spot locations designated by Engineer for testing. 4. campis latin